<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Concept Completion LLP &#187; inspection</title>
	<atom:link href="http://conceptcompletion.co.uk/tag/inspection/feed/" rel="self" type="application/rss+xml" />
	<link>http://conceptcompletion.co.uk</link>
	<description></description>
	<lastBuildDate>Tue, 24 Jan 2012 07:56:53 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Christ Church Southport lighting installation</title>
		<link>http://conceptcompletion.co.uk/2008/12/15/christ-church-southport-lighting-installation/</link>
		<comments>http://conceptcompletion.co.uk/2008/12/15/christ-church-southport-lighting-installation/#comments</comments>
		<pubDate>Mon, 15 Dec 2008 10:34:08 +0000</pubDate>
		<dc:creator>David</dc:creator>
				<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[dimmers]]></category>
		<category><![CDATA[inspection]]></category>
		<category><![CDATA[installation]]></category>
		<category><![CDATA[lighting]]></category>
		<category><![CDATA[system]]></category>
		<category><![CDATA[testing]]></category>

		<guid isPermaLink="false">http://conceptcompletion.co.uk/?p=226</guid>
		<description><![CDATA[Concept Completion were chosen by Christ Church Southport to design, specify and install a new platform lighting system for their main space. The church have a wide variety of activities in the space throughout the week and so required a creative and flexible solution which could be used by a number of different people. The [...]]]></description>
			<content:encoded><![CDATA[<p><strong>Concept Completion</strong> were chosen by Christ Church Southport to design, specify and install a new platform lighting system for their main space. The church have a wide variety of activities in the space throughout the week and so required a creative and flexible solution which could be used by a number of different people.</p>
<p>The design, which was undertaken by our in house specialist, Tim Perrett, saw <strong>Concept Completion</strong> supply and install three custom built internally wired bars, twelve Selecon Acclaim fresnel lanterns and two Paradime six way dimmers, all of which were finished in a white powder coat finish to help them blend in with the aesthetics of the space. In order to control the system, a Strand 100 Series theatrical lighting console was also installed to enable individual control of each lantern.</p>
<div style="text-align: center">
<div class="ngg-galleryoverview">
<div class="ngg-gallery-thumbnail"><a class="thickbox" rel="" href='http://conceptcompletion.co.uk/wp-content/gallery/southport-lighting-installation/img_2196.jpg' title=''><img src='http://conceptcompletion.co.uk/wp-content/gallery/southport-lighting-installation/thumbs/thumbs_img_2196.jpg' alt='img_2196.jpg' class='ngg-singlepic ngg-none' /></a></div>
<div class="ngg-gallery-thumbnail"><a class="thickbox" rel="" href='http://conceptcompletion.co.uk/wp-content/gallery/southport-lighting-installation/img_2199.jpg' title=''><img src='http://conceptcompletion.co.uk/wp-content/gallery/southport-lighting-installation/thumbs/thumbs_img_2199.jpg' alt='img_2199.jpg' class='ngg-singlepic ngg-none' /></a></div>
<div class="ngg-gallery-thumbnail"><a class="thickbox" rel="" href='http://conceptcompletion.co.uk/wp-content/gallery/southport-lighting-installation/img_2206.jpg' title=''><img src='http://conceptcompletion.co.uk/wp-content/gallery/southport-lighting-installation/thumbs/thumbs_img_2206.jpg' alt='img_2206.jpg' class='ngg-singlepic ngg-none' /></a></div>
</div>
</div>
<p>Initially, <strong>Concept Completion</strong> provided a full briefing document to the church’s council outlining the proposed design, its applications, flexibility and physical look in the space. Liaison then took place with Christ Church’s appointed structural and electrical engineers to ensure the building had the capacity for the proposed installation.</p>
<p>The installation was then carried out over a number of days by <strong>Concept Completion</strong>’s highly trained staff which included fixing the new custom lighting bars safely to the infrastructure of the building; mounting and wiring the two three phase dimmers and terminating the control cabling into custom wallmount panels. The whole system was then tested to ensure that it complied with current electrical regulations. Finally, a demonstration was made to some of the users of the system as to the system’s creative capabilities and to ensure they knew how to operate their new platform lighting solution.</p>
]]></content:encoded>
			<wfw:commentRss>http://conceptcompletion.co.uk/2008/12/15/christ-church-southport-lighting-installation/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

